Power

Sterlite Power concludes refinancing of LVTPL Green Energy corridor project

Sterlite Power has achieved another significant milestone by successfully concluding the refinancing of the Lakadia-Vadodara Transmission project loan. The project became fully operational in January 2023, and this refinancing was accomplished within a remarkably short time frame of 12 months. The refinancing was made possible through a collaboration with HDFC Bank, India Infrastructure Finance Company …

The post Sterlite Power concludes refinancing of LVTPL Green Energy corridor project appeared first on Energy Asia.

Related Articles

Back to top button